Why choose the Shuttle Cooling Conveyor
- You can extend the in-mould cooling time, even with limited space
- You get the option to ‘park’ parts with extremely long cooling times on a single conveyor
- Achieve flexibility and optimal output with extended cooling times and a shorter synchronized belt
- Payback time can be as short as 1 year
- The DISA Shuttle can run with 2 or 3 sand belt conveyors in parallel for optimum productivity